Author(s):
1. Jelena Trivan, Rudarski institut Prijedor, e-mail Save Kovačevića bb, Prijedor,
Republic of Srpska, Bosnia and Herzegovina
2. Irena Rajlić, ArcelorMittal Prijedor,
Republic of Srpska, Bosnia and Herzegovina
3. Ljubica Figun, Rudarski fakultet Prijedor,
Republic of Srpska, Bosnia and Herzegovina
Abstract:
Contemporary approach to the process of managing the drainage system and monitoring the effects of their work envisages that at all stages of the development of the surface mine the control of the operation of all facilities or the entire system for the protection of the surface and groundwater baths and the continuous monitoring of water events and hydrodynamic processes is carried out. The aim of this paper was to collect data on the amount of precipitation at the monthly level, the state of the water level of the Gomjenica river and the amount of water that will be used to assess the efficiency of the system during the period of operation of the Buvač surface mine from 2013 to 2016.
Key words:
drainage,surface mine,amount of precipitation,river water,pumped quantity of water
Thematic field:
The exploitation of mineral resources and mining technological processes
Date of abstract submission:
20.09.2017.
Conference:
7th Balkan Mining Congress